Transformers for Infrastructure

Infrastructure projects are judged on the schedule and the paperwork. The transformer has to arrive on a date, match the specification in the tender, and come with the test report that the client’s engineer will ask for. We build units for utility distribution, water and wastewater plants, rail, ports and public buildings, with the documentation pack your project needs.

What the load looks like

What we recommend

Distribution Transformer

Utility and public works distribution, 50 to 3150 kVA.

Oil Immersed Transformer

Outdoor substations for water, rail and port projects.

Medium Voltage Transformer

11 kV to 33 kV distribution and step-down.

Specification notes

Typical rating50 – 3150 kVA per unit
Primary voltage6.6 kV, 11 kV, 22 kV, 33 kV
Secondary voltage230 V, 400 V, 415 V
TypeOil immersed or cast resin dry type
CoolingONAN, ONAN/AF
Vector groupDyn11 standard, others to specification
DocumentationRoutine test report, outline drawing, terminal diagram
StandardsIEC 60076

Practical notes

Questions buyers ask

Yes. Every unit ships with its routine test report, outline drawing and terminal diagram.
Yes. Send the tender document and we will answer each technical clause.
Typically 30 days after drawing approval. Larger batches are scheduled against your energisation date.
Yes. Export packing, commercial invoice, packing list and certificate of origin are prepared for the shipment.

Send us the specification

Rating, primary and secondary voltage, frequency, quantity and the application. We answer within one working day.