1000 kVA Distribution Transformer
A 1000 kVA unit is the size most often specified for factories, malls, hospitals, office buildings. We build it oil immersed or cast resin, in 50 Hz and 60 Hz, to IEC 60076.
Indicative specification
| Power Rating | 1000 kVA |
|---|---|
| Primary Voltage | 3.3 / 6 / 10 / 11 / 13.2 / 13.8 / 15 / 20 / 22 / 33 / 34.5 / 35 kV class |
| Secondary Voltage | 480/277 V, 400/230 V, 380/220 V, or customized |
| Phase | Three-phase |
| Cooling Type | ONAN |
| Core Material | High-efficiency (CRGO) silicon steel |
| Connection Group | Dyn11, Yyn0, Dyn5 |
| Winding Material | Copper / Aluminium |
| Frequency | 50 / 60 Hz |
| Insulation | Mineral oil |
| Tap Changer | ± 2 × 2.5% Off-Circuit Tap Changer (OCTC) |
| Short-circuit impedance | 4 – 6% |
| Temperature Rise | 60 – 65 °C |
| Noise Level | ≤ 60 dB at 1 meter |
| Enclosure | Hermetically sealed steel tank, weatherproof for indoor and outdoor use |
| Altitude | ≤ 1,000 m or customized |
| Ambient Temperature Range | -30 °C to +50 °C |
| Accessories | Conservator tank, oil level indicator, gas relay, pressure relief valve, etc. |
| Standards Compliance | IEC 60076, IEEE C57, ANSI C57 |
| Applications | Commercial and institutional buildings, industrial facilities, oil & gas, solar and wind energy, utility grid connections, data centers, and coastal islands and high-altitude regions. |
| Transport & Installation | Lifting lugs, skid base, galvanized fittings |
| Warranty | Two years |
| Delivery Time | Typically 30 days, depending on quantity |
| Min. order quantity | ≥ 1 set |
Neighbouring ratings
Is this the right size?
If you know the connected load and the diversity, send both and we will check the rating before you order. Oversizing means paying for capacity that sits idle every hour of the year.
Oil immersed or cast resin?
- Oil immersed: Yes, 1000 kVA oil immersed is a standard build.
- Cast resin: Yes, 1000 kVA cast resin is a standard build.
- Oil units go outside or in a separate substation room; cast resin units go inside the building.
Where a 1000 kVA unit is used
Questions buyers ask
Typically 30 days after drawing approval, depending on the quantity.
Yes. Test report, outline drawing and a terminal diagram go out with the unit.
Usually. Send the old nameplate or the outline drawing and we will check the footprint, terminal positions and loss figures before quoting.
Rating, primary and secondary voltage, frequency, vector group, quantity, application and the ambient conditions. A drawing or a nameplate photo settles the rest.
Send us the specification
Rating, primary and secondary voltage, frequency, quantity and the application. We answer within one working day.
Email info@xsdfftransformer.com · WhatsApp +852 54162620
