How We Build a Transformer
Six stages from steel to test report. Each one happens in our own workshop, and each one has an inspection point before the unit moves on.
The build sequence
- Core. Grain-oriented silicon steel, cut and stacked in mitred step-lap.
- Winding. Copper or aluminium conductor, wound in-house and checked for turns.
- Assembly. Core and coil assembled, leads routed and brazed.
- Drying. Vacuum drying in our own plant, then vacuum oil filling.
- Tank. Corrugated wall or radiator, pressure tested before filling.
- Testing. Routine tests to IEC 60076, then the test report.
Where we differ
- We do not buy semi-finished units and rebrand them.
- Loss and impedance are measured on the unit that ships, not on a sample.
- Drying and filling happen on site, so the moisture content is ours to control.
- The engineer who built the unit is reachable after it ships.
Quality Control
Inspection points through the build.
Testing
Routine and type tests.
Our Factory
Where the work happens.
Send us the specification
Rating, primary and secondary voltage, frequency, quantity and the application. We answer within one working day.
Email info@xsdfftransformer.com · Tel +86 15867897761 · WhatsApp +852 54162620