{"a":1}

250 kVA Distribution Transformer

A 250 kVA unit is the size most often specified for small factories, commercial buildings, housing estates and light industrial sites. At this rating cast-resin dry-type builds are frequent choices where the unit sits indoors or where fire rules restrict oil. We build it oil immersed or cast resin, in 50 Hz and 60 Hz, to IEC 60076.

Indicative specification

Power Rating250 kVA
Primary Voltage3.3 / 6 / 10 / 11 / 13.2 / 13.8 / 15 / 20 / 22 / 33 / 34.5 / 35 kV class
Secondary Voltage480/277 V, 400/230 V, 380/220 V, or customized
PhaseThree-phase
Cooling TypeAN (natural air) / AF (forced air) on dry-type builds; ONAN on oil-immersed builds
Core MaterialHigh-efficiency (CRGO) silicon steel
Connection GroupDyn11, Yyn0, Dyn5
Winding MaterialCopper / Aluminium
Frequency50 / 60 Hz
InsulationEpoxy cast resin (F class 155 °C / H class 180 °C) or mineral oil
Tap Changer± 2 × 2.5% Off-Circuit Tap Changer (OCTC)
Short-circuit impedance4.0% (typical)
Temperature RiseWinding rise ≤ 100 K (F class) / ≤ 125 K (H class); oil-immersed: top oil ≤ 50 K, winding ≤ 55 K
Noise Level≤ 60 dB at 1 meter
EnclosureHermetically sealed steel tank, weatherproof for indoor and outdoor use
Altitude≤ 1,000 m or customized
Ambient Temperature Range-30 °C to +50 °C
AccessoriesConservator tank, oil level indicator, gas relay, pressure relief valve, etc.
Standards ComplianceDesigned to comply with IEC 60076, IEEE C57 and ANSI C57 as applicable to the order
ApplicationsCommercial and institutional buildings, industrial facilities, oil & gas, solar and wind energy, utility grid connections, data centers, and coastal islands and high-altitude regions.
Transport & InstallationLifting lugs, skid base, galvanized fittings
WarrantyTwo years
Delivery TimeTypically 30 days, depending on quantity
Min. order quantity≥ 1 set

Neighbouring ratings

Is this the right size?

If you know the connected load and the diversity, send both and we will check the rating before you order. Oversizing means paying for capacity that sits idle every hour of the year.

Oil immersed or cast resin?

Questions buyers ask

Typically 30 days after drawing approval, depending on the quantity.
Send the connected load, the diversity factor and any planned expansion. We check the load against the rating and tell you whether 250 kVA leaves enough headroom before you order.
Yes. Test report, outline drawing and a terminal diagram go out with the unit.
Usually. Send the old nameplate or the outline drawing and we will check the footprint, terminal positions and loss figures before quoting.
Rating, primary and secondary voltage, frequency, vector group, quantity, application and the ambient conditions. A drawing or a nameplate photo settles the rest.

Send us the specification

Rating, primary and secondary voltage, frequency, quantity and the application. We answer within one working day.

Scroll to Top