Transformers for Office Buildings

The substation is usually in a basement or rooftop plant room, which makes dry type construction, low noise and compact dimensions the deciding factors.

Talk to an Engineer

Email
info@xsdfftransformer.com

Phone
+86 158 6789 7761

WhatsApp
+852 2416 2620

Office building load is dominated by HVAC, lifts, lighting and an increasingly heavy IT and server load. Daily and seasonal variation is large, but peak diversity is also high — not every floor is at full load at once.

The substation is usually in a basement or rooftop plant room, which makes dry type construction, low noise and compact dimensions the deciding factors.

What Matters for This Application

Recommended Transformer Solution

Sizing Guidance

Office demand is usually calculated per square metre for lighting and small power, plus actual plant ratings for chillers, lifts and IT, with a diversity factor applied across floors and tenancies.

Installation Notes

Testing and Commissioning

Before energisation the unit is checked on site: insulation resistance, voltage ratio and vector group, earthing and terminations, and functional checks of protection and monitoring devices. See the testing page for the full programme.

Frequently Asked Questions

Several smaller units give better resilience and let you match load growth, at higher cost per kVA and more floor area. One large unit is cheaper and more efficient at full load but creates a single point of failure.
For indoor plant rooms inside occupied buildings, effectively yes in most jurisdictions. Outdoor oil immersed units are still used where a dedicated, bunded external substation exists.
Specify a maximum sound level, use anti-vibration mounts, flexible connections and, where necessary, an acoustic enclosure. Locating the plant room away from quiet zones is the cheapest measure of all.