Transformer Solutions for Commercial Buildings
We work inside that process: responding to specifications, issuing datasheets and drawings for approval, and delivering units that pass site acceptance testing first time.
For commercial developments the transformer is usually specified by the MEP consultant, procured by the contractor and approved by the developer and the local authority.
We work inside that process: responding to specifications, issuing datasheets and drawings for approval, and delivering units that pass site acceptance testing first time.
How we support commercial projects
- Technical submittals: datasheet, GA drawing, loss figures, sound level
- Compliance statements against the specified standard
- Coordination of access, weight and lifting with the site logistics plan
- Factory testing and site acceptance test support
- Spare parts and maintenance documentation at handover
Testing and Documentation
Routine and type testing to IEC 60076 / IEEE C57.12, with certified test reports, general arrangement drawings and installation manuals supplied with every unit. See testing and certifications.
Frequently Asked Questions
Yes. Send the specification and we will respond with a compliant offer or a documented alternative where a better solution exists.
Hebei Youge Electrical Equipment Co., Ltd. — list the documents you provide for consultant approval.
Hebei Youge Electrical Equipment Co., Ltd. — confirm your spare parts and after-sales support offering.